Technical Requirements for "SO..."
"So..." is an aerial hoops act performed by two aerialists.
Click to Print this Page
Rigging : To hang a double hoop system and a climb-up rope. An accessable rigid or tensioned beam or rigging bar capable of bearing 1000kg a minimum of 2m in length, parallel to the front of the stage (alternatively, 3 appropriate individual rigging points) 8m high ideally (please contact Simon with details).
Paging points may be required to page equipment away when not in use.
For health and safety reasons, it is that there is a clear area of 3.5m diameter underneath the hoops.
P.A. System : For CD or MD playback.
Lighting : To be discussed during technical rehearsal.
Changing Room : A nearby secure changing room for costume, make-up and warming up.
Refreshments : Light refreshments during the event.
Set up Time : Approximately 3 hours prior to start of event.
Get out Time: Approximately 30 minutes
Direction and Passes : Clear directions and any necessary passes to be sent before the event.
Parking : Van for unloading and loading, nearby parking.
For any further information contact : Simon Schofield
Mobile : 00 44 (0) 7721 587279