Risk Assessment
for "Free Standing Rig"
|
 |
|
|
|
|
|
|
|
|
|
|
|
Hazards
|
Safeguards
|
Risks
|
| |
 |
| |
|
|
|
|
|
|
|
1.
|
Unloading
and laying out of equipment (including alloy aerial rig, cables, shackles,
webbing, ratchet straps, block and tackles etc).
|
Ensuring
site is fit for purpose, clear of all obstacles and public. All performers
and technicians to be aware of location and public at all times.
|
Very remote
|
|
2.
|
Erection
of rig i.e. lifting from horizontal position on ground to vertical. |
Area
to be cordoned from public by a physical barrier or stewards, at the
client's discretion. All equipment to be checked and visually inspected
prior to and after the erection. All people instructed as to their
jobs.
|
Remote
risk to performers/technicians
|
|
3.
|
Performance |
All
performers to be professional and rehearsed. Area is barriered to
prevent entry by public and stewarded where feasible.
|
Very remote
|
|
4.
|
Lowering
of rig |
As
2 - Erection |
Remote
|
|
5.
|
Loading |
Equipment
to be separated from public by barrier or stewarding at the client's
discretion until the site has been cleared. |
Remote
|
| |
|
|
|
| |
|
|
|
| |
|
The
person responsible for ensuring all safeguards mentioned :
|
|
| |
|
Simon
Schofield
|
|
| |
|
Mobile
: 0044 (0) 7721 587279
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|